top of page

FIRST TIME IN PORT HISTORY UNLOADING OF TWO CONTAINER SHIPS WITH TWO CONTAINER CRANES

Port of Adria’s multiple investments in the company are delivering the desired results. On Monday 09.10.2017, on Pier 1, two container ships M/V Max Ventura and M/V E.R. Wellington were berthed and serviced at same time.


With acquisition of new Liebherr STSG crane (model P137), together with the existing crane and all other supporting investments such as horizontal equipment, new terminal operating software, human resources development, Port of Adria is able to simultaneously and successfully unload containers from both ships.


Ships were serviced at the same time, each ship by one container crane, with continuous support of Gottwald HMK 260 E - universal mobile crane, providing quality, productive and efficient service to our partners.


Company Port of Adria, with support of Global Ports Holding, strives to maintain such continuity of changes and innovations in all aspects of its business.


Tags:

Archive
Search By Tags
logo_edited.png

Address                                

Ulica barskih logoraša 2
85 000 Bar, Montenegro

Tel. + 382 30 301 100

fax. + 382 30 301 105

SGS_ISO 9001_TCL_LR.jpg
SGS_ISO 14001_TCL_LR.jpg
download.png
  • Grey Facebook Icon
  • Grey LinkedIn Icon
  • Grey YouTube Icon

design by J.Pirovic

bottom of page